Aluminium Gilding (277)
Definition: Hydrocarbon resin based, serially dried, high temperature resistant, bright-looking, anti-corrosive industrial topcoat paint.
Area of Application: Aluminium metal paint can be applied on electrical poles for protective and decorative purposes in places exposed to high heat and danger of fire, natural gas pipes, metal chimneys, heating and steam boilers, pipes of heat conducting systems. Resistant to temperatures up to 120°C.
Application Tools: Pistole, Roller & Brush
Application Thinner: It is applied without thinning.
Method of Application: The paint should be thoroughly stirred before starting the application. The surface to be applied should be cleaned from all kinds of oil, dirt and rust (sanded, scraped, burned or washed with solvent). It is applied to the cleaned and surface prepared in two coats. Metal painting is applied 24 hours after the primer application in the applications to be made on the primer. It is recommended to apply it without thinning. Care should be taken to mix frequently to prevent collapse during application.
Drying Time:
Anti-dust drying: 5-7 minutes Touch drying: 25 minutes.
Final drying: 24 hours Second coat application: After 4 hours
Paintable Area:
10-14 m2 / kg (30-microns dry film thickness)
9-13 m2 / lt (30-micron dry film thickness)
Storage Type and Duration: 1 year in a cool and dry environment not receiving direct sunlight, sealed packaging (+5°C to +30°C)
Safety Warnings:
(S2) (Keep out of the reach of children.)
(S7) (Store in a closed, cool and ventilated place.)
Hazard Warnings:
(R10/11) (Easily flammable)
(R20/21/22) (Harmful by inhalation in contact with skin if swallowed.)
(R36/38) (Irritant to eyes and skin)
Notes: Temperature of the application surfaces should be above +5°C.
Package Filling | TL / Pieces |
1/4 | 6.00 TL |
1/2 | 8.50 TL |
1/1 | 16.50 TL |
GLN | 56.00 TL |
12/1 | 276.00 TL |